Dive Shaft at 4 Darcy St, Parramatta Square (Built)

AnewX Pty Ltd

Scope: FRP concrete civils package with our Scope of Works including; constructing a new Dive Shaft, Motorised Vehicle Turning Circle, Shotcrete Ground Stabilisation, Ground Slabs/ Pavements and a number of different Retaining Wall types, under both time precious and logistically challenging conditions.

Ellis Constructions Pty Ltd

Rawson Road, Rose Bay

COGG completed 30m of Shoring Wall and Capping Beam on a high-end residential Project. Formed, poured and stripped ahead of Programme, despite it being considered optimistic and challenging.

On Point Piling Pty Ltd

Dig It – Rose Bay

Scope: 54lm of Capping Beam, incorporating gradients and step-downs, constructed ahead of programme. The end product looked fantastic, leaving all parties extremely happy

BMD Civil

Bringelly

Scope: F.R.P. Contract working with BMD assisting them with the construction of a bridge abutment

York Civil

Frenchs Forest

Scope: F.R.P. (Form-Reo-Place) Contract working with York Civil to assist them with completing their Northern Beaches Hospital Network Enhancement